The Concrete Calculator estimates mixed volume for slabs, cylinders or a known area with depth. Combine up to 10 regions, add a material allowance and convert volume to cubic feet, cubic yards and cubic metres. Whole bags use the mixed yield you enter; optional prices add a material budget.
Use it for uniform slabs or complete cylindrical pours. Cylinder mode uses diameter and depth. For a post hole already occupied by a post, supply a separately measured net area: the tool does not infer an annular gap. Measure footprints with square footage, or estimate aggregate with gravel.
US inputs use feet for lengths and diameter, inches for depth, and square feet for known area. Metric inputs use metres, centimetres and square metres respectively. Active dimensions must be positive, at most 1e12. Allowance is 0–100%. Enter the bag’s mixed yield in ft³, litres or m³. Prices are optional, non-negative and use one selected currency label.
Rectangle area = length×width. Circle area = π×(diameter/2)². Base volume = sum of area×depth. Adjusted volume = base×(1+allowance/100). Bags = ceiling(adjusted volume/bag yield). Unit factors: 1 ft = 0.3048 m; 1 in = 0.0254 m; 1 ft³ = 0.028316846592 m³; 1 yd³ = 0.764554857984 m³.
A 12 ft×10 ft slab at 4 in thick has volume 12×10×(4/12)=40 ft³, about 1.481481 yd³ or 1.132674 m³. With no allowance and an illustrative mixed yield of 0.6 ft³ per bag, 40/0.6=66.666667, so buy 67 whole bags. At an example 8 currency units per bag the material cost is 536; this is not a market quote.
Укажите выход готового бетона, а не массу мешка. Пример 0,6 ft³ на мешок можно изменить.
Число мешков округляется вверх после запаса. Цена мешков — за целое число, насыпного материала — за точный объём.
Только оценка материала. Без расчёта конструкций, арматуры, прочности, работ, доставки и налогов. Единицы меняют размеры и цену за объём; валюта — лишь обозначение.
От размеров к объёму смеси и количеству мешков.